
- Home
- Blog
Thank you for your trust and cooperation in the past year. We wish you and your beloved pleasant
Christmas holidays and sound health, happiness and harmony in the New Year.
Order for the supply of 1 piece of air sampling equipment VOPV-10 for the State Atomic Energy Agency in Poland.
PTW Dosimetry and VF a.s. sucessful cooperation in the field of metrology solutions reaches new level.
VF signed a contract for the supply of 4 units of DPD (DISPENSER OF PERSONAL DOSIMETERS) for Beloyarsk NPP
VF JSC won the tender for the supply of a dosimetric system for the newly built PET/CT (positron emission tomography-PET and computed tomography - CT) working area at Pardubice hospital, which is part of the holding Hospitals of Pardubice region, JSC.
VF has signed the contract for delivery of radioactive solid waste monitor to International Atomic Energy Agency (IAEA)
In June 2020, VF, in cooperation with PTW, won the tender for the upgrade of the calibration laboratory for Thailand Institute of Nuclear Technology in Bangkok
VF, a.s. has successfully completed the qualification process for approved suppliers registration in South Korea
VF a.s. successfully took part in the IAEA tender and signed a contract for delivery and installation of Personal Radiation Protection Equipment – Personal Surface Contamination Monitors
VF will ensure delivery of a complete calibration laboratory for the Institute of Nuclear Research in Řež (UJV) in the Czech Republic
VF a.s. concluded the contract for suply of whole body contamination monitor Exitscan-2 for INER (Institute of Nuclear Energy Research) Taiwan
The fourth year of the VF BADMINTON MASTER CUP tournament took place in March 2020.
VF has signed the contract for supply of 37 pcs aerosol activity monitors for VF Chinese partner
In January 2020 VF signed a contract with the National Radiation Protection Institute of the Czech Republic (SURO) for delivery of TL and OSL personal dosimeters’ reader.
Dear business partners and friends, Let us express our thanks for your valued custom and cooperation throughout the past year. We wish you and your loved ones Merry Christmas and Happy New Year 2020.
VF a.s. successfully finished a project of the delivery and installation of the metrological laboratory by the polish Central office of Measures.
In October 2019, a contract was signed for the delivery of the Radiation Monitoring System for the ELI Beamlines laser center in Dolni Brezany, Czech Republic
In October 2019, a contract for the supply radiation monitoring equipment to the Bangladesh Atomic Energy Commission was signed
VF has signed a contract for delivery of contamination monitors to the National Nuclear Research Center in Swierk, Poland
Sports enthusiasts from VF on in-line skates were challenging each other's strength on the 8000 m track.
Conclusion of the contract for delivery of automatic dosimeters dispensers for the Leningrad NPP
Another of the many events of the VF sport team was the cycling race Climber 2019. The race took place on 28.9.2019 gathering 27 competitors from VF employees.
VF in cooperation with HI-Q (VF distributor and partner for the USA) participated in the Radiological Effluents and Environmental Workshop (REEW), held in Orlando, FL, USA.
VF has signed a contract for replacement of 52 pcs of safety modules RM-2300 in NPP Temelin with our significant partner, the company ČEZ. The system is designed for operational and accident radiation monitoring.
The company VF has successfully completed the production of WAM-303 for the Tianwan NPP.
At the end of July in Czech city Cerna Hora there was held the II International Conference on Radiation Protection organised by the Polish Association of Radiation Supervision Inspectors (SIOR).
In June 18 to 21, 2019, under IAEA protection in Vienna was organised the International Symposium on Standards, Applications and Quality Assurance in Medical Radiation Dosimetry (IDOS 2019).
In June, we carried out transportation of the facility FRM-03 aimed for waste free release on the Chernobyl NPP.
Please be informed that since 1. 5. 2019 the company VF, a.s. switched to the new website www.vfnuclear.com.